Bilanzierung: Wie die Energiebilanzierung funktioniert
Stromerzeugung und -verbrauch müssen jederzeit im Gleichgewicht sein. Wenn nicht, wird teure Ausgleichsenergie benötigt. So funktioniert es.
Was ist Bilanzierung?
The grid has no memory
Imagine a water pipe with no tank. Water flows in one end and out the other. If more flows in than out, pressure builds and pipes burst. If less flows in, taps run dry. The electricity grid is exactly like this — but at 50 Hz and continent-wide scale. Balance groups are the accounting mechanism that assigns responsibility for keeping that balance.
TSO/ÜNB
Übertragungsnetzbetreiber
Transmission Operator
Operates the high-voltage grid (380/220 kV). Responsible for overall grid stability. Activates reserve capacity when groups go out of balance. There are 4 in Germany.
BKV
Bilanzkreisverantwortlicher
Balance Group Manager
Legally responsible for keeping their balance group in check. Must submit day-ahead schedules and pay for any imbalances. Usually a large LF or trading company.
BKN
Bilanzkreisnehmer
Balance Group Member
Any generator or consumer assigned to a balance group. They do not directly interact with the TSO — their BKV handles that. Their meter data feeds the settlement.
MSB
Messstellenbetreiber
Meter Operator
Reads meters and transmits consumption data via MSCONS. Their data accuracy directly impacts settlement quality. Late data = delayed settlement for the entire chain.
In Aktion sehen
In Aktion sehen
Switch between scenarios to see how a 2 MW deviation in a 15-minute slot turns into a real financial charge for the BKV.
Balance Group Simulator
Generators
100 MW
feed-in
Balance
0 MW
imbalance
Consumers
100 MW
offtake
Feed-in and offtake are equal. No balancing energy needed. This is the ideal state.
Schlüsselkonzepte
What Powers the System
Day-Ahead Schedules (Fahrpläne)
Reserve Capacity (Regelenergie)
Balancing Energy Price (AEP)
Intraday Trading Reduces Costs
Wie leitnetz hilft
Reliable Metering Data, Every Interval
MSCONS Dispatch Tracking
Every MSCONS sent by the MSB is tracked with status: VALIDATED → DISPATCHED → DELIVERED. No message lost, no settlement gap.
Interval Data Management
leitnetz handles 15-minute interval data ingestion, validation, and onward delivery — at the volume of a live energy market.
Error Detection Early
Validation rules catch data anomalies before MSCONS is dispatched. Catching a 0 reading or a meter rollover before it reaches the NB prevents costly settlement corrections.